Original Paper

Components supply risk assessment based on ANP and TOPSIS

  • ZHANG Guo-quan ,
  • ZHANG Yun-song ,
  • ZHAO Zhong-hua
Expand
  • 1 College of Quartermaster Technology, Jilin University, Jilin 130062, China;2 Faculty of Management and Economics, Dalian University of Technology, Dalian 116023, China

Received date: 2012-01-10

  Online published: 2023-05-26

Abstract

Most of the current researches focus on suppliers risk and have no supply risk analysis from the perspective of the supply chain globally. The paper analyzes the elements of supply risk, and establishes supply risk evaluation index system of the supply chain, and then integrates ANP and TOPSIS methods to assess supply risk. The method considers feedback relationship between the internal and external groups of elements and then ranks the evaluation objects according to the closeness with idealized goal. Finally, the model is verified by empirical research.

Cite this article

ZHANG Guo-quan , ZHANG Yun-song , ZHAO Zhong-hua . Components supply risk assessment based on ANP and TOPSIS[J]. Journal of Dalian Maritime University, 2013 , 39(2) : 82 -85 . DOI: 10.16411/j.cnki.issn1006-7736.2013.02.013

References

[1]TUNCEL G, ALPAN G. Risk assessment and management for supply chain networks: A case study[J]. Computers in Industry, 2010, 61(3): 250-259. 

[2]HILLMAN M. Strategies for managing supply chain risk[J]. Supply Chain Management Review, 2006,10(5): 11-13.

[3]ZSIDISIN G A. Managerial perceptions of supply risk[J]. Journal of Supply Chain Management, 2006, 39(1): 14-26. [4]WU T, BLACKHURST J, CHIDAMBARAM V. A model for inbound supply risk analysis[J]. Computers in Industry, 2006, 57(4): 350-365. 

[5]NOORDEWIER T G, JOHN G, NEVIN J R. Performance outcomes of purchasing arrangements in industrial buyer-vendor relationships[J]. Journal of Marketing, 1990,54(4): 80-93. 

[6]NORRMAN A, JANSSON U. Ericsson’s proactive supply chain risk management approach after a serious sub-supplier accident[J]. International Journal of Physical Distribution & Logistics Management, 2004, 34(5): 434-456. 

[7]LIU P, WANG T. Research on risk evaluation in supply chain based on grey relational method[J]. Journal of Computers, 2008, 3(10): 28-35. 

[8]王莲芬. 网络分析法 (ANP) 的理论与算法[J]. 系统工程理论与实践, 2001,21(3): 44-50. WANG Lian-fen. The theory and algorithm of analytic network process[J]. Systems Engineering-theory & Practice,2001, 21(3): 44-50. (in Chinese)

Outlines

/