DONG Mao
,
GUO Nai-sheng
,
WANG Nan
,
WANG Peng-fei
,
FANG Chen-ze
. Bridge structure model conversion method based on Revit and MIDAS / CIVIL[J]. Journal of Dalian Maritime University, 2020
, 46(3)
: 101
-108
.
DOI: 10.16411/j.cnki.issn1006-7736.2020.03.012
[1] ADAN A, QUINTANA B, PRIETO SA, et al.An autonomous robotic platform for automatic extraction of detailed semantic models of buildings[J].Automation in Construction, 2020, 109(102963):1-20 [2] LEON-ROBLES CA, REINOSO-GORDO JF, GONZALEZ-QUINONES JJ.Heritage Building Information Modeling (H-BIM) Applied to A Stone Bridge[J]. ISPRS International Journal of Geo-Information, 2019, 8(3):121-134 [3] ZHU Jun-xiang, WANG Xiang-yu, WANG Peng, et al.Integration of BIM and GIS: Geometry from IFC to shapefile using open-source technology[J].Automation in Construction, 2019, 102:105-119 [4] COSTIN A, ADIBFAR A, HU H, CHEN SS.Building Information Modeling (BIM) for transportation infrastructure - Literature review, applications, challenges, and recommendations[J].Automation in Construction, 2018, 94:257-281 [5] 张勇, 张然然.地下综合管廊全寿命周期风险评估与分析[J].西安建筑科技大学学报(自然科学版), 2019, 51(02):294-300 [6]ZHANG Yong, ZHANG Ran-ran.Life-cycle risk assessment and analysis of underground comprehensive utility tunnel[J].Journal of Xi' an University of Architecture & Technology(Natural Science Edition), 2019, 51(02):294-300 [7]刘纯洁, 王大庆.超大规模城市轨道交通线网全寿命周期健康管理系统研究[J].城市轨道交通研究, 2019, 22(05):7-11 [8]LIU Chun-jie, WANG Da-qin.Life Cycle Health Management System of Super-large Scale Urban Rail Transit Network[J].Urban Mass Transit, 2019, 22(05):7-11 [9]杨海旭, 李沅潮, 方颖, 等.摩擦摆隔震建筑全寿命周期经济评价[J].土木工程与管理学报, 2018, 35(06):94-100 [10]YANG Hai-xu, LI Yuan-chao, FANG Ying, et al.Full Life Cycle Economic Evaluation of Buildings Isolated by Friction Pendulum System[J].Journal of Civil Engineering and Management, 2019, 22(05):7-11 [11] 宋子婧.公路桥梁建养一体化信息管理研究[D].南京: 东南大学, 2015. [12]SONG Zi-jing.Research on information management of integrated construction and maintenance of highway bridge [D]. Nanjing: Southeast University, 2015. (in Chinese) [13] 封大为.BIM模型与力学结构分析接口开发研究[D].西安: 长安大学, 2019. [14]FENG Da-wei.Research on Interface Development of BIM Model Transformation and Structural Mechanics Analysis [D].Xi’an: Chang’an University, 2019. (in Chinese) [15]陈志为, 吴焜, 黄颖, 黄锰钢.基于的复杂结构有限元精细模型生成[J].土木工程与管理学报, 2018, 35(05):60-64 [16]CHEN Zhi-wei, WU Kun, Huang Ying, et al.Generation of Refined FE Model of Complex Structures Based on BIM[J].Journal of Civil Engineering and Management, 2018, 35(05):60-64 [17]COJOCARU D, KARLSSON AM.An object-oriented approach for modeling and simulation of crack growth in cyclically loaded structures[J].Advances in Engineering Software, 2008, 39(12):995-1009 [18]刘照球, 张吉.结构分析模型框架和数据转换应用[J].工业建筑, 2015, 45(02):178-183 [19]LIU Zhao-qiu, Zhang Ji.Bim-Based Structural Analysis Model And Data Conversion Application[J].Industrial Construction, 2015, 45(02):178-183 [20]WONG K Y.Instrumentation and Health Monitoring of Cable-Supported Bridges[J].Structural Control & Health Monitoring, 2004, 11(2):91-124 [21] 马飞.基于BIM的水利工程安全监测管理系统研究[D]. 河北:河北工程大学, 2017. [22]MA Fei.Research on Safety Monitoring System of Hydraulic Engineering Based on BIM [D]. Hebei: Hebei University of Engineering, 2017. (in Chinese) [23]黄伟, 徐建, 陆新征, 等.主动振动控制的有限元分析[J].科学技术与工程, 2019, 19(24):102-106 [24]HUANG Wei, XU Jian, LU Xin-zheng, et al.Active Vibration Control Using Finite Eelement Method Strategy[J].Science Technology and Engineering, 2019, 19(24):102-106 [25]杨培诚, 李志成.基于的大体积混凝土施工期仿真分析[J].公路工程, 2012, 37(01):136-138 [26]YANG Pei-cheng, LI Zhi-cheng.Based on the MIDASCIVIL C40 Large Volume Concrete Construction Simulation Analysis[J].Highway Engineering, 2012, 37(01):136-138 [27] 高应振.基于MCTOOLS程序的桥梁参数化建模及应用分析[D]. 大连:大连理工大学,2013. [28]GAO Ying-zhen.Bridges Parametric Modeling and Analysis Based on MCTOOLS Program [D]. Dalian: Dalian University of Technology, 2013. (in Chinese) [29]陈庆军, 王永琦, 汪洋, 等.基于及 的应县木塔建模研究[J].西安建筑科技大学学报自然科学版, 2017, 49(03):369-374 [30]CHEN Qing-jun, WANG Yong-qi, WANG Yang, et al.Research on the modeling of Yingxian wooden tower based on revit and revit API[J].Journal of Xi' an University of Architecture & Technology(Natural Science Edition), 2017, 49(03):369-374 [31]宋杰, 张亚栋, 王孟进, 等.与结构模型转换接口研究[J].土木工程与管理学报, 2016, 33(01):79-84 [32]SONG Jie, ZHANG Ya-dong, WANG Meng-jin, et al.Research of Model Exchange Interface Between Revit and ANSYS[J].Journal of Civil Engineering and Management, 2016, 33(01):79-84 [33] 朱殷桥.面向结构行为的钢桥BIM信息管理研究[D]. 成都:西南交通大学,2018. [34]ZHU Yin-qiao.Steel Bridge BIM Information Management for Structural Behavior [D]. Chengdu: Southwest Jiaotong University, 2018. (in Chinese)