[1]HSU H P, TAI H H, WANG C N, et al. Scheduling of collaborative operations of yard cranes and yard trucks for export containers using hybrid approaches [J]. Advanced Engineering Informatics,2021, 48(5):101-292.
[2]MEI S, ZHANG T, YING T, et al. Scheduling-optimization of yard cranes with minimal energy consumption at container terminals[J]. Computers & Industrial Engineering,2016, 13(9):704-713.
[3]LEE D H, CAO Z, CHEN J H, et al. Load scheduling of multiple yard crane systems in container terminal with buffer areas[J]. Transportation Research Record,2009 (2097):70-77.
[4]邵乾虔,徐婷婷,杨惠云,等.集卡分批到达模式下的进口箱场桥作业调度优化[J].控制与决策, 2016, 31(9):9.
SHAO Q Q, XU T T, YANG H Y, et al. Scheduling optimization of yard crane for import containers based on truck batch arrival pattern[J]. Control and Decision, 2016, 31(9):9. (in Chinese)
[5]靳志宏, 王莉, 邢磊, 等. 考虑集卡预约信息的堆场箱区分配和场桥配置协同优化[J]. 大连海事大学学报, 2019, 45(3): 1-8.
JIN Z H, WANG L, XING L, et al. Collaborative optimization of yard block allocation and yard crane allocation considering truck appointment information[J]. Journal of Dalian Maritime University, 2019, 45(3): 1-8. (in Chinese)
[6]初良勇, 李淑娟, 阮志毅. 多箱区多场桥调度优化模型及算法实现[J]. 上海海事大学学报, 2017, 38(1):37-42.
CHU L Y, LI S J, RUAN Z Y. Scheduling optimization model and algorithm implementation of multiple container blocks with multiple yard cranes[J]. Journal of Shanghai Maritime University, 2017, 38(1):37-42. (in Chinese)
[7]郑红星, 刘保利, 董译文, 等. 考虑适时倒箱的进口重箱区多场桥调度优化[J]. 系统工程理论与实践, 2017, 37(10): 2700-2714.
ZHENG H X, LIU B L, DONG Y W, et al. Multi-yardcrane scheduling optimization of inbound full container block with timely relocation[J]. Systems Engineering-Theory & Practice, 2017, 37(10): 2700-2714. (in Chinese)
[8]马梦知, 范厚明, 计明军, 等. 集装箱码头送箱集卡预约与场桥调度协同优化[J]. 交通运输系统工程与信息, 2018, 18(3): 202-209.
MA M Z, FAN H M, JI M J, et al. Integrated optimization of truck appointment for export containers and crane deployment in a container terminal[J]. Journal of Transportation Systems Engineering and Information Technology, 2018, 18(3): 202-209. (in Chinese)
[9]郑红星, 段爽, 孙丛. 考虑翻箱的场桥调度和提箱集卡数量的集成优化[J]. 运筹与管理, 2021, 30(9): 48-55.
ZHENG H X, DUAN S, SUN C. Integrated optimization of yard crane scheduling and number of external container trucks considering relocation[J]. Operations Research and Management Science, 2021, 30(9): 48-55. (in Chinese)
[10]TORBI I, AIDI S, MAZOUZI M, et al. Optimization approach for yard crane scheduling problem under a combined constraints in container terminals[C]//2022 14th international colloquium of logistics and supply chain management (LOGISTIQUA2022). International Conference on Logistics. EL JADIDA:IEEE, 2022:412-417. doi:10.1109/LOGISTIQUA55056.2022.9938023.
[11]王耀宗, 胡志华, 田曦丹, 等. 考虑集卡到港时间延迟的堆场起重机动态调度研究[J]. 大连理工大学学报, 2023, 63(3): 291-302.
WANG Y Z, HU Z H, TIAN X D,et al. Research on dynamic scheduling for yard crane with truck arrival time delay[J]. Journal of Dalian University of Technology, 2023, 63(3): 291-302. (in Chinese)
[12]LI J J, YANG J Y, XU B W, et al. A flexible scheduling for twin yard cranes at container terminals considering dynamic cut-off time[J]. Journal of Marine Science and Engineering, 2022, 10(5): 675.
[13]GHOMI M F, JAVANSHIR H, GANJI S S, et al. Optimisation of yard crane scheduling considering velocity coefficient and preventive maintenance[J]. Shipping and Transport Logistics, 2014, 6(1): 88-108.