2020, Vol. 46(2): 59-69    DOI: 10.16411/j.cnki.issn1006-7736.2020.02.008
A Bi-objective optimization for liner schedule recovery based on improved NSGA-II
LIN Jin 1, LV Jing *1, WANG Rui2
(1. Transportation Engineering College, Dalian Maritime University, Dalian 116026, China; 2. College of Software, Northeastern University, Shenyang 110169, China)
Received 2019-09-18  Revised 2019-12-08
Supporting info