[1]LIU B L, LI Z C, SHENG D, et al. Integrated planning of berth allocation and vessel sequencing in a seaport with one-way navigation channel[J]. Transportation Research Part B, 2021, 143: 23-47.
[2]WANG T S, DU Y Q, FANG D B, et al. Berth allocation and quay crane assignment for the trade-off between service efficiency and operating cost considering carbon emission taxation[J]. Transportation Science, 2020, 54(5): 1307-1331.
[3]吴云强, 张戎. 单向航道下连续泊位分配与船舶调度集成优化[J]. 计算机工程与应用, 2022, 58(9): 246-255.
WU Y Q, ZHANG R. Integrated optimization of continuous berth allocation and ship scheduling under one-way channel[J].Computer Engineering and Applications,2022, 58(9): 246-255.(in Chinese)
[4]吴暖, 王诺, 吴迪, 等. 考虑客户满意度的计划外来船靠泊调度模型及算法[J]. 运筹与管理, 2022, 31(7): 22-27.
WU N, WANG N, WU D, et al. Model and algorithm of unscheduled ship berthing scheduling considering customer satisfaction[J]. Operations Research and Management, 2022, 31 (7): 22-27.(in Chinese)
[5]UNSAL O, OGUZ C. An exact algorithm for integrated planning of operations in dry bulk terminals[J]. Transportation Research Part E, 2019, 126: 103-121.
[6]牛猛, 王钟逸, 李亚军, 等. 考虑使用优先权的泊位分配和船舶调度集成优化[J]. 高技术通讯, 2020, 30(9): 972-981.
NIU M, WANG Z Y, LI Y J, et al. Berth allocation and ship scheduling integrated optimization considering the priority of berth in use[J]. Chinese High Technology Letters, 2020, 30(9): 972-981.(in Chinese)
[7]宋云婷, 王诺. 基于时间不确定的集装箱码头靠泊计划优化[J]. 交通运输系统工程与信息, 2020, 20(4): 224-230.
SONG Y T, WANG N. A simulation-based optimization approach to container terminal berth planning under time uncertainty[J]. Journal of Transportation Systems Engineering and Information Technology, 2020, 20(4): 224-230.(in Chinese)
[8]RODRIGUES F, AGRA A. An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times[J]. European Journal of Operational Research, 2021, 295(2): 499-516.
[9]邰世文, 商剑平, 饶卫振. 煤炭码头船货匹配下泊位动态分配多目标优化模型及算法[J]. 运筹与管理, 2022, 31(1): 14-21+29.
TAI S W, SHANG J P, RAO W Z. Multi-objective optimization model and genetic algorithm for dynamic berth allocation problem under cargo matching in coal terminals [J]. Operations Research and Management, 2022, 31 (1): 14-21+29.(in Chinese)
[10]CHEIMANOFF N, FONTANE F, KITRI M N, et al. Exact and heuristic methods for the integrated berth allocation and specific time-invariant quay crane assignment problems[J]. Computers & Operations Research, 2022, 141: 105695.
[11]冯鹏, 郭子坚, 姜影, 等. 考虑装船机联机作业的煤炭出口码头装船作业调度优化[J]. 上海海事大学学报, 2021, 42(2): 26-33.
FENG P, GUO Z J, JIANG Y, et al. Scheduling optimization of loading operation in coal export terminals considering union operation of ship loaders [J]. Journal of Shanghai Maritime University, 2021, 42 (2): 26-33.(in Chinese)
[12]MENEZES G C, MATEUS G R, RAVETTI M G. A branch and price algorithm to solve the integrated production planning and scheduling in bulk ports[J]. European Journal of Operational Research, 2017, 258(3): 926-937.
[13]De LEóN A D, LALLA-RUIZ E, MELIáN-BATISTA B, et al. A machine learning-based system for berth scheduling at bulk terminals[J]. Expert Systems with Applications, 2017, 87: 170-182.
[14]LI C A, WU S R, LI Z, et al. Intelligent scheduling method for bulk cargo terminal loading process based on deep reinforcement learning[J]. Electronics, 2022, 11(9): 1390.
[15]ERNST A T, OgUZ C, SINGH G, et al. Mathematical models for the berth allocation problem in dry bulk terminals[J]. Journal of Scheduling, 2017, 20(5): 459-473.
[16]HU Z H. Heuristics for solving continuous berth allocation problem considering periodic balancing utilization of cranes[J]. Computers & Industrial Engineering, 2015, 85: 216-226.